In June 2022 Forest Manor went out to bid for roads and walks. The entire subdivision has been milled and resurfaced as well as all bad sidewalks replaced. See photos below for work done.

fm203
fm205
fm206
fm208
fm209
fm210
fm211
fm212
fm213
fm214
fm215
fm216
fm217
fm218
fm219

The Mike DeVivio Memorial Path has been given new freshly laid asphalt and trimmed out in stone for the pedestrians who utilize it. It adds a nice feature to the already nice parks we currently have and will offer strollers, wagons, bikes and pedestrians alike a smoother alternative to stone. See pictures below.

devivio-path-11
devivio-path-12
devivio-path-13
devivo-path
divivo-path-10
divivo-path-2
divivo-path-3
divivo-path-4
divivo-path-5
divivo-path-6
divivo-path-7
divivo-path-8
divivo-path-9

In May 2022 we had to run new water and sewer to the building as we have been working the past year without any water or restroom facilities. The project which went out to bid  April 2022 has now come to completion. As soon as the inside work is completed we will have restroom and breakroom facilities. Please see photos below for a look at the project as it was being completed.

ws1
ws10
ws11
ws12
ws13
ws14
ws15
ws16
ws17
ws18
ws19
ws2
ws20
ws21
ws22
ws23
ws24
ws3
ws4
ws5
ws6
ws7
ws8
ws9

After the transition to our new building, we needed to build new offices. The project was in the planning stage in 2021 and went to bid in March of 2022. Work began in May 2022. The various contractors worked diligently to complete the project by mid September. Below are some photos of the project in various stages.

ob1
ob10
ob11
ob12
ob13
ob14
ob15
ob16
ob17
ob18
ob19
ob2
ob20
ob21
ob22
ob23
ob24
ob25
ob26
ob27
ob28
ob29
ob3
ob30
ob31
ob32
ob33
ob34
ob35
ob36
ob37
ob38
ob39
ob4
ob40
ob41
ob42
ob43
ob44
ob45
ob46
ob47
ob48
ob49
ob5
ob50
ob51
ob52
ob53
ob54
ob55
ob56
ob57
ob58
ob59
ob6
ob60
ob61
ob62
ob63
ob64
ob65
ob66
ob67
ob68
ob69
ob7
ob70
ob71
ob72
ob8
ob9

in 2022 we formed an IGA with the City of Lockport to pave Farrell Rd and redo the bad sidewalks. Lockport was the lead and handled the bid process and specs. we financed areas the belong to us and Lockport financed theirs. The work was completed in the summer of 2022. Below are photos of the project.

fr1
fr10
fr11
fr12
fr2
fr3
fr4
fr5
fr6
fr7
fr8
fr9

The 2021 season brought some much needed repairs to the Lockport Heights Subdivision. This was the last joint project left over from the HG/HTHD split and was completed in September of 2021. In addition to the road replacement the new Highway Commissioner also added the replacement of more sidewalks and driveway aprons to the scope of work. Driveway aprons are part of the right of way and if they are in deteriorated condition, should be replaced when the road is done.

lh1
lh2
lh3
lh4
lh5
lh6

The first project of the new administration was to replace deteriorating sidewalks, driveways and parking areas at the senior housing facility. All areas were milled or removed and new put in. this was completed in July of 2021. Below are some photos of the project.

dji_0109-1
dji_0110-1
dji_0111-1
dji_0112-1
dji_0113-1
dji_0114-1
dji_0115-1
dji_0116-1
dji_0117-1
dji_0118-1
dji_0119-1
dji_0124-1
dji_0125-1
dji_0126-1
dji_0127-1
dji_0128-1
dji_0129-1
dji_0130-1
dji_0131-1
dji_0132-1
dji_0133-1
dji_0134-1
dji_0135-1
dji_0136-1
dji_0137-1
dji_0138-1
dji_0139-1
dji_0140-1
dji_0141-1
dji_0142-1
dji_0143-1
dji_0144-1
dji_0145-1
dji_0146-1
dji_0148-1
dji_0149-1
dji_0150-1
dji_0151-1
dji_0152
dji_0153
dji_0154
dji_0155